The First Presbyterian Church was expanding, and the Omni*Hub system became the system to meet their unique, multi-functional needs.

The Conservatek team worked closely with the Architect to develop a 56′ X 96′ spaceframe to provide the clear span for a facility that would have the lightness above for a religious service, with clean lines that would support a panel system directly on the spaceframe with clean details.

The Omni*Hub Type A system, in an 8′ X 8′ module size was the answer to the Architects prayers.


Client: First Presbyterian Church of Kingsport, Kingsport, TN
Architect: Allen N. Dryden, Kingsport, TN
Contractor: Steadman Constr. Co., Kingsport, TN